Pakaka Open Pit Level 5890mRL
The Pakaka open pit project is designed to operate at the 5890mRL level, where our focus is on efficient extraction and optimal resource management. This level will facilitate effective operations while ensuring compliance with safety and environmental standards.
Pakaka Open Pit Level 5850mRL – Sump Area
At the 5850mRL level, our attention shifts to the sump area, where effective dewatering and drainage strategies are implemented. This critical section of the project is vital for maintaining operational efficiency and preventing water accumulation, which can impact mining activities and safety.